1. There shall be no signs of torsion on the guardrail column, nor shall it be welded or lengthened at the interface or both ends of the guardrail plate, especially the debris at both ends must be cleaned and tidy. The preliminary design starts from the highway control points, and the spacing between columns can be adjusted appropriately according to the specific distance. In addition, the installation details of the columns should be consistent with the original design drawings and coordinated with the highway route. The column must be firmly buried underground, with the burial depth based on the depth reference in the initial design and perpendicular to the horizon.
2. There are many methods to install guardrails. Regardless of the method used, the construction team should try to avoid underground pipeline facilities on the highway as much as possible.
3. After project installation, a very smooth streamline should be formed in both horizontal and vertical directions. This scene has a good guiding effect on the driver's line of sight.
4. Guardrail boards should be installed within the boundary of the highway and should not be far away from the highway.
5. Each screw hole and beam on the corrugated guardrail board must be accurately positioned, and the accuracy of their position is related to the overall effect.
6. Before installing the column guardrail, attention should be paid to the situation inside the column at all times to prevent foreign objects from entering the column.